194. Install bus bar and bus coupler on LT  factor, diversity factor, plant
                                                 line. (5 Hrs.)                      utility factor etc. (05 Hrs.)

             Professional  Examine the faults  195. Identify various parts of relay and  Types of relays and its operation.
             Skill 25 Hrs.;  and carry out      ascertain the operation. (5 Hrs.)     Types of circuit breakers, their
                           repairing of circuit
             Professional  breakers.         196. Practice setting of pick up current and  applications and functioning.
             Knowledge     (Mapped NOS:         time setting multiplier for relay operation.  Production of arc and quenching.
             04 Hrs.                            (5 hrs.)
                           PSS/N7001)                                                 (04 Hrs)
                                             197. Identify the parts of circuit breaker,
                                                check its operation. (5Hrs.)
                                             198. Test tripping characteristic of circuit
                                                breaker for over current and short circuit
                                                current. (5 hrs.)
                                             199. Practice on repair and maintenance of
                                                circuit breaker. (5 hrs.)

              Professional  Install   and    200. Demonstrate different charger EV scenario in India and EV
              Skill 22 Hrs.;  troubleshoot      specifications. (05 hrs)             Charging basic theory.
              Professional  Electric Vehicle  201. Perform installation of EV charging EV Charging safety requirements
              Knowledge    charging             Station for Public places. (10 hrs)  (04 Hrs)
              04 Hrs.      stations.
                                             202. Perform installation of Home EV
                                                charging stations. (10 hrs)


               Project work / Industrial visit:
               a) Battery charger/Emergency light
               b) Control of motor pump with tank level
               c) DC voltage converter using SCRs

               d) Logic control circuits using relays e) Alarm/indicator circuits using sensors