Page 22 - Electrician - 2nd Year TP
P. 22

Professional  DC motors by    173. Perform speed control and reversing the  Speed control of 3 phase
        Knowledge    using    solid      direction of rotation of AC motors by using  induction motor by using VVVF/
        11 Hrs.      state devices.      thyristors / AC drive. (18 Hrs.)       AC Drive. (11 Hrs.)
                                      174. Construct and test a universal motor speed
                                         controller using SCR. (14 Hrs.)
        Professional Detect the faults 175. Assemble circuits of voltage stabilizer and  Basic concept, block diagram
        Skill 50 Hrs.; and troubleshoot   UPS. (10 Hrs.)                         and working of voltage
                     inverter, stabilizer,                                       stabilizer, battery charger,
        Professional  battery charger,  176. Prepare an emergency light. (10 Hrs.)
        Knowledge    emergency light 177. Assemble circuits of battery charger and  emergency light, inverter and
        10 Hrs.                                                                  UPS.
                     and UPS etc.         inverter. (10Hrs.)
                     (Mapped NOS:      178. Test, analyze defects and repair voltage  Preventive and breakdown
                     PSS/N6002)                                                  maintenance. (10 Hrs.)
                                          stabilizer, emergency light and UPS.
                                          (05Hrs.)
                                       179. Maintain, service and troubleshoot battery
                                          charger and inverter. (07Hrs.)
                                       180. Install an Inverter with battery and connect
                                          it in domestic wiring for operation. (08Hrs.)

        Professional Erect overhead    181. Draw layout of thermal power plant and  Conventional and non-
        Skill 23 Hrs.; domestic service   identify function of different layout elements.  conventional sources of energy
                     line, outline various  (5 Hrs.)                             and their comparison.
        Professional  power plant layout
        Knowledge    and explain smart  182. Draw layout of hydel power plant and  Power generation by thermal
        04 Hrs.                           identify functions of different layout elements.  and hydel power plants.
                     distribution grid    (5 Hrs.)                               (04 Hrs.)
                     and          its
                     components.       183. Visit to transmission / distribution
                     (Mapped NOS:         substation. (08 Hrs.)
                     PSS/N0106)
                                       184. Draw actual circuit diagram of substation
                                          visited and indicate various components.
                                          (5 Hrs.)

        Professional  Plan, assemble   185. Prepare layout plan and Identify different Various ways of electrical
        Skill 25 Hrs.;  and install solar  elements of solar power system. (05 Hrs.)  power generation by non-
                     panel                                                       conventional methods.
        Professional                   186. Prepare layout plan and Identify different
        Knowledge                         elements of wind power system. (05 Hrs.)  Power generation by solar and
        07 Hrs.                        187. Assemble and connect solar panel for  wind energy.
                                          illumination. (15 Hrs.)                Principle and operation of solar
                                                                                 panel. (07 Hrs.)
        Professional  Erect overhead 188. Practice installation of insulators used in  Transmission and distribution
        Skill 50 Hrs.;  domestic service  HT/LT line for a given voltage range. (04hrs.)  networks.
        Professional  line, outline various  189. Draw single line diagram of transmission  Line insulators, overhead
        Knowledge    power plant layout  and distribution system. (04Hrs.)       poles and method of joining
        10 Hrs.      and explain smart                                           aluminum      conductors.
                     distribution grid and  190. Measure current carrying capacity of  (05 Hrs.)
                     its components.     conductor for given power supply. (04hrs.)
                     (Mapped NOS:     191. Fasten jumper in pin, shackle and
                     PSS/N0106)          suspension type insulators. (07Hrs.)
                                       192. Erect an overhead service line pole for single Safety precautions and IE rules
                                          phase 230V distribution system in open pertaining to domestic service
                                          space. (10 Hrs.)                       connections.
                                       193. Practice on laying of domestic service line. Various substations.
                                          (10 Hrs.)                              Various terms like – maximum
                                                                                 demand, average demand, load

                                                        (xx)
   17   18   19   20   21   22   23   24   25   26   27