Page 12 - Wireman - TP - Hindi
P. 12
सीखने / मू ांकन यो प रणाम
इस पु क के पूरा होने पर आप यह जान सक गे
S.No. Learning Outcome Ref. Ex.No.
1 Apply safety precautions and prepare profile with an appropriate accuracy as per
drawing using basic jobs of marking components, filing, drilling, riveting, fitting,
joining etc. (NOS: PSS/N1707) 1.1.01 - 1.2.14
2 Prepare terminations, make good quality of electrical wire joints for single and multi
strand conductors and carry out crimping, soldering and brazing. (NOS: PSS/N2512,
PSS/N1331) 1.3.15 - 1.3.20
3 Draw and set up DC and AC circuits, involving R-L-C components, perform
measurement of various electrical parameters with due care and safety. Carry out
Sealing of energy meters and Monitor meter readings using MRI.(NOS:PSS/N1707)
(NOS: CSC/N0110) 1.4.21 - 1.7.41
4 Explain basic concepts of generation, transmission and distribution of
electrical power including renewable energy. (NOS: PSS/N7001) 1.8.42 - 1.8.49
5 Plan and prepare Plate and Pipe earthing installations and ensure safe
and effective earthing. (NOS: PSS/N6002) 1.9.50 - 1.9.55
6 Carry out wiring, testing, and maintenance of DC machines including
DC motor starters. (NOS: N/A) 1.10.56 - 1.10.62
7 Carry out wiring, testing, and maintenance of small transformers, 1ϕ & 3ϕ
AC motors and Alternators including AC motor starters. (NOS: N/A) 1.11.63 - 1.11.68
8 Read, understand and draw electrical Schematic drawings of power and
control circuits using industry standard symbols.(NOS: N/A) 1.12.69 - 1.12.73
9 Plan, draw, assemble and perform various domestic wiring. Carry out
Testing, maintenance and repair/ replacement of domestic wiring. (NOS: N/A) 1.13.74 - 1.16.94
10 Carry out wiring of control panels, assemble accessories and
equipment. (NOS: PSS/N1709) 1.16.95 - 1.17.103
11 Install, test and carry out maintenance of batteries and solar cell with due
care and safety. (NOS: PSS/N6003) 1.18.104 - 1.18.109
SYLLABUS FOR WIREMAN
Duration Reference Learning Reference Learning Professional Knowledge
Outcome Outcome (Trade Theory)
Professional Apply safety precautions 1. Visit various sections of the Occupational Safety & Health:
Skill 110 and prepare profile with institutes and identify locations of Scope of the Wireman trade
Hrs; an appropriate accuracy different installations. (03 hrs) and career progression
Professional as per drawing using 2. Identify safety symbols and Power sector scenario in India.
Knowledge basic jobs of marking hazards. (04 hrs) Safety rules and safety signs
20 Hrs components, filing, 3. Practice elementary first aid. (04 for Danger, Warning, caution &
drilling, riveting, fitting, hrs) personal safety messages
joining etc. (NOS: PSS/ 4. Practice safe methods of fire Basic injury prevention, Basic
N1707) fighting in case of electrical fire first aid, Hazard identification,
(04 hrs) avoidance and PPEs.
5. Demonstrate by visual aids to Personal safety and factory
isolate electric supplies and safety
(x)