Page 15 - R&ACT 1st Year - TT- TELUGU
P. 15

capillary & filter drier,   48. Test performance of direct   and  drier.  Evacuation,  leak
                             evacuation  &gas         start refrigerator. (05 hrs.)  testing,  gas  charging  method
                             charging.(NOS:  Not                                     in refrigerator, (07 hrs..)
                             available)            49. Cleaning and flushing of
                                                      evaporator and condenser
                                                      with dry nitrogen. (05 hrs.)
                                                   50. Replacement of capillary
                                                      tube and drier. (05 hrs.)
              Professional   Check components      51. Tracing electrical circuit of   Frost Free Refrigerator
              Skill 42 Hrs.’  of frost-free           Frost-Free refrigerator. (10   Study the construction and
              Professional   ref rigerat or           hrs.)                          working  of  Frost  Free  (2  or
              Knowledge      (electrical/          52. Checking, fault finding       3  door)  Refrigerator  parts
              10 Hrs.        mechanical), wiring      and testing of electrical      particularly,  the  forced  draft
                             of frost-free freeze     accessories like thermostat,   cooling,  Air  Duct  circuit,
                             & air distribution in    timer, defrost heaters, bi-    temperature control in Freezer
                             refrigerator sector.     metal, air louvers etc. and    &  cabinet  of  Refrigerator,
                             Leak  detection,         other system components.       air  flapper  /  louver  used  in
                             evacuators  &  gas       (10 hrs.)                      refrigerator section, automatic
                             charging.                                               defrost system.    Study    of
                                                   53. Checking air distribution     Electrical accessories  &  their
                                                      system. (03 hrs.)
                                                                                     functions  (  Timer,  Heater,
                                                   54. Servicing of refrigerator.    Bimetal, Relay, OLP, T/S etc.)
                                                      (07hrs.)                       Refrigerator  cabinet  volume
                                                   55. Testing the performance of    calculation.5hrs..)
                                                      refrigerator. (02 hrs.)

                                                   56. Identify three and four door no   Refri g erato r (I n verter
                                                      frost refrigerator. (07 hrs.)  Technology) Study the
                                                                                     construction  and  its  working
                                                   57. Testing components of three/  of  two  and  three  door  frost
                                                      four door refrigerator. (03 hrs.)
                                                                                     free  refrigerator  with  inverter
                                                                                     technology  Care  and
                                                                                     maintenance. (05 hrs..)

              Professional   Dismantle, repair and   58. Identify different types of   Compressor
              Skill 39 Hrs.;   assemble  hermetic,    compressor. (09 hrs.)          Function, construction, working,
                             fixed  and  variable
              Professional                                                           application of hermetic
              Knowledge      speed  compressor,                                      compressor,(Fixed speed and
                             and testperformance.
              10 Hrs.                                                                variable speed compressor)like
                                                                                     Reciprocating, rotary, scroll and
                                                                                     inverter type.(5Hrs..)

                                                   59. Dismantle  /assembling        Study  the  construction  &
                                                      reciprocating/rotary           working of reciprocating, rotary,
                                                      compressor. (15 hrs.)          scroll,  wobble  &  swash  plate
                                                                                     compressor.  wet  compression,
                                                   60. Identify different parts of   oil,  properties,  lubrication
                                                      dismantled  compressor.        methods. (05 hrs..)
                                                      (15 hrs.)
              Professional   Identify the terminals   61. Identify terminal sequence of   AC  motors  and  their  types.
              Skill 50 Hrs.;  of sealed compressor    hermetic compressor motor      Advantages of AC motor over
              Professional   and their wiring and     by using digital multimeter    DC motor. Split phase induction
              Knowledge 8    measure  current,        and measure starting current   motors, working principle and
              Hrs.           volts, watts and use     and running current by using   construction.Starting winding
                             of  DOL  starter  with   ammeter and AVO meter.         and running winding.Starting
                             different types of       (12 hrs.)                      current and running current.
                             motors.                                                 Study the shaded pole motor,
                                                                                     RSIR,  CSIR,  CSR  and    PSC
                                                                                     motors.(6 Hrs..)
                                                             (xiii)
   10   11   12   13   14   15   16   17   18   19   20