Professional  Install,  test  and  57. Use  of  various  types  of  cells.  (08  Phase sequence meter. (10 hrs.)
              Skill 50 Hrs.;  maintenance of bat-  Hrs.)
                            teries and solar cell.                                 Chemical effect of electric current
              Professional                     58. Practice  on  grouping  of  cells  for  and Laws of electrolysis.
              Knowledge 10  (NOS: PSS/N6001)      specified voltage and current under
              Hrs.                                different  conditions  and  care.  (12   Explanation of Anodes and cath-
                                                  Hrs.)                            odes.
                                                                                   Types of cells, advantages / disad-
                                               59. Prepare  and  practice  on  battery   vantages and their applications.
                                                  charging  and  details  of  charging
                                                  circuit. (12 Hrs.)               Lead acid cell; Principle of opera-
                                                                                   tion and components.
                                               60. Practice  on  routine,  care/  mainte-
                                                  nance and testing of batteries. (08  Types of battery charging, Safety
                                                  Hrs.)                            precautions, test equipment and
                                                                                   maintenance.
                                                                                   Basic principles of Electro-plating
                                                                                   and cathodic protection
                                                                                   Grouping of cells for specified volt-
                                                                                   age and current.


             Professional  Estimate, Assem- 61. Determine the number of solar cells  Principle  and  operation  of  solar
             Skill 200 Hrs.; ble, install and test   in series / parallel for given power  cell. (10 Hrs.)
                           wiring system.         requirement. (10 Hrs.)           I.E. rules on electrical wiring.
                           (NOS: PSS/N6001) 62. Identify various conduits and different
             Professional                         electrical accessories. (8 Hrs.)  Types of domestic and industrial
             Knowledge 42                                                          wirings.
             Hrs.                              63. Practice cutting, threading of different   Study  of  wiring  accessories  e.g.
                                                  sizes & laying Installations. (17 Hrs.)  switches,  fuses,  relays,  MCB,
                                               64. Prepare  test  boards  /  extension  ELCB, MCCB etc.
                                                  boards and mount accessories like   Grading of cables and current rat-
                                                  lamp  holders,  various  switches,   ings.
                                                  sockets, fuses, relays, MCB, ELCB,
                                                  MCCB etc.  (25 Hrs.)
                                               65. Draw layouts and practice in PVC  Principle of laying out of domestic
                                                  Casing-capping, Conduit wiring with  wiring.
                                                  minimum to more number of points   Voltage drop concept.  (14 Hrs.)
                                                  of minimum 15 mtr length. (15 Hrs.)
                                                                                   PVC conduit and Casing-capping
                                               66. Wire up PVC conduit wiring to control   wiring system.
                                                  one lamp from two different places.
                                                  (15 Hrs.)                        Different types of wiring -
                                               67. Wire up PVC conduit wiring to control   Power,  control,  Communication
                                                  one lamp from three different places.   and entertainment wiring.
                                                  (15 Hrs.)
                                               68. Wire up PVC conduit wiring and prac-
                                                  tice control of sockets and lamps in
                                                  different combinations using switch-
                                                  ing concepts. (15 Hrs.)
                                               69. Wire up the consumers main board  Wiring circuits planning, permis-
                                                  with MCB & DB’s switch and distribu- sible load in sub-circuit and main
                                                  tion fuse box. (15 Hrs.)         circuit. (14 Hrs.)
                                               70. Prepare and mount the energy meter  Estimation of load, cable size, bill
                                                  board. (15 Hrs.)                 of material and cost.
                                               71. Estimate the cost/bill of material for  Inspection  and  testing  of  wiring
                                                  wiring of hostel/ residential building  installations.
                                                  and workshop. (15 Hrs.)