Page 16 - Electrician 1st Year TP
P. 16
అభ్ాయూసం / అంచన్ఘ వైేయదగిన ఫలిత్ం
ఈ ప్ుస్తికాన్ై ప్ూరైితి చ్యస్్టన తరైా్వత మీర్ు చ్యయగలైర్ు
క్రా. స్ం. అభ్ాయూస ఫలిత్ం అభాయూస్ం స్ం.
1 Prepare profile with an appropriate accuracy as per drawing following
safety precautions. (NOS: PSS/N2001) 1.1.01 - 1.1.16
2 Prepare electrical wire joints, carry out soldering, crimping and measure
insulation resistance of underground cable. (NOS: PSS/N0108) 1.2.17 - 1.2.26
3 Verify characteristics of electrical and magnetic circuits.
(NOS: PSS/N6001, PSS/N6003) 1.3.27 - 1.5.56
4 Install, test and maintenance of batteries and solar cell.(NOS: PSS/N6001) 1.6.57 - 1.6.61
5 Estimate, Assemble, install and test wiring system. (NOS: PSS/N6001) 1.7.62 - 1.8.74
6 Plan and prepare Earthing installation. (NOS: PSS/N6002) 1.8.75 - 1.8.77
7 Plan and execute electrical illumination system and test. (NOS: N/A) 1.9.78 - 1.9.82
8 Select and perform measurements using analog / digital instruments
and install/ diagnose smart meters. (NOS: PSS/N1707) 1.10.83 - 1.10.89
9 Perform testing, verify errors and calibrate instruments. (NOS: N/A) 1.10.90 - 1.10.92
10 Plan and carry out installation, fault detection and repairing of domestic
appliances. (NOS: PSS/N6003) 1.11.93 - 1.11.97
11 Execute testing, evaluate performance and maintenance of transformer.
(NOS: PSS/N2406, PSS/N2407) 1.12.98 - 1.12.106
గమనిక :
• ITI విద్్ఘయూర్ల థా లు ర్టష్ర్ర/ UT పరేభ్ుత్వా పరిధిలోని సంబంధిత్ క్్టరి్మక/ పరిశరిమల శ్్టఖ నుండి యోగయూత్్ఘ ధృవీకరణ్
పత్రేం (ట్్రరేడ్ ల�ైసెన్్స) ప్ొ ందవచుచు.
• ట్ెై ైనీలను సులభ్త్రం చేయడ్ఘనిక్్ట పబ్ లు క్ డొమెైన్ లో అందుబాట్ులో ఉనై ర్టష్ట ్ర్ర లు/UT పిరేని్సప్్టల్ & ట్్రరేడ్ ఇన్ స్ర్రక్రర్ లు
క్ోసం నోట్ిఫైిక్ేషన్ ను చ్యడండి.
(xiv)