Page 23 - Electrician 1st Year TP
P. 23

Professional   Perform  testing,  90. Practice  for  range  extension  and   the tamper notifications of meter.
              Skill 25 Hrs.;  verify  errors  and   calibration  of  various  measuring   (08 hrs.)
                            calibrate  instru-   instruments. (10 Hrs.)
                            ments.             91. Determine errors in resistance mea-  Errors and corrections in measure-
              Professional   (NOS: N/A)          surement by voltage drop method.   ment.
              Knowledge                          (8 hrs)                           Loading  effect  of  voltmeter  and
              05Hrs.                                                               voltage drop effect of ammeter in
                                               92. Test single phase energy meter for   circuits.
                                                 its errors. (7 Hrs.)

             Professional  Plan and carry out   93. Dismantle and assemble electrical   Extension of range and calibra-
             Skill 75 Hrs.;  installation,  fault   parts of various electrical appliances   tion  of  measuring  instruments.
                            detection  and  re-   e.g. cooking range, geyser, washing   (05 hrs.)
                            pairing of domestic   machine and pump set. (25 Hrs.)   Working principles and circuits of
             Professional  appliances.         94. Service and repair of electric iron,   common domestic equipment and
             Knowledge      (NOS: PSS/N6003)      electric  kettle,  cooking  range  and   appliances.
             10 Hrs.                              geyser. (12 Hrs.)

                                               95. Service and repair of induction heater
                                                  and oven. (10 Hrs.)

                                               96. Service  and  repair  of  mixer  and
                                                  grinder. (10 Hrs.)
                                               97. Service and repair of washing ma-
                                                  chine. (13Hrs.)

             Professional  Execute  testing,   98. Verify terminals, identify components  Concept of Neutral and Earth. (10
             Skill 75 Hrs.;  evaluate  perfor-   and calculate transformation ratio of  hrs.)
                            mance and main-      single-phase transformers. (8 Hrs.)
                            tenance of trans-                                      Working  principle,  construction
             Professional  former.            99. Perform OC and SC test to determine  and classification of transformer.
             Knowledge 12                        and efficiency of single-phase trans-  Single  phase  and  three  phase
             Hrs.           (NOS: PSS/           former. (12Hrs.)                  transformers.
                            N2406, PSS/
                            N2407)            100  Determine  voltage  regulation  of   Turn ratio and e.m.f. equation.
                                                 single-phase transformer at different
                                                 loads and power factors. (12 Hrs.)  Series  and  parallel  operation  of
                                                                                   transformer.
                                              101 Perform series and parallel opera-
                                                 tion of two single phase transformers.  Voltage Regulation and efficiency.
                                                 (12 Hrs.)

                                              102 Verify the terminals and accessories
                                                 of three phase transformer HT and LT
                                                 side. (6Hrs.)
                                              103Perform 3 phase operation (i) delta-  Auto Transformer and instrument
                                                 delta, (ii) delta-star, (iii) star-star,   transformers (CT & PT). (12 Hrs.)
                                              (iv)  star-delta  by  use  of  three  single  Method of connecting three single
                                                 phase transformers. (6 Hrs.)      phase transformers for three phase
                                                                                   operation.
                                              104Perform  testing  of  transformer  oil.
                                                 (6 Hrs.)                          Types  of  Cooling,  protective  de-
                                              105Practice on winding of small trans-  vices, bushings and termination etc.
                                                 former. (8 Hrs.)                  Testing of transformer oil.
                                              106Practice of general maintenance of  Materials  used  for  winding  and
                                                 transformer. (5 Hrs.)             winding wires in small transformer.
                                                                                   (06 Hrs.)








                                                             (xxi)
   18   19   20   21   22   23   24   25   26   27   28