Page 22 - Electrician 1st Year TP
P. 22
72. Practice wiring of hostel and residen-
tial building as per IE rules. (15 Hrs.)
73. Practice wiring of institute and work-
shop as per IE rules. (15 Hrs.)
74. Practice testing / fault detection of
domestic and industrial wiring instal-
lation and repair. (15Hrs.)
Professional Plan and prepare 75. Prepare pipe earthing and measure Special wiring circuit e.g. godown,
Skill 25 Hrs.; Earthing installa- earth resistance by earth tester / tunnel and workshop etc. (14 Hrs.)
tion. megger. (10 Hrs.) Importance of Earthing.
Professional (NOS: PSS/ 76. Prepare plate earthing and measure Plate earthing and pipe earthing
Knowledge N6002) earth resistance by earth tester / methods and IEE regulations.
07 Hrs. megger. (10 Hrs.)
77. Test earth leakage by ELCB and
relay. (5 Hrs.)
Professional Plan and execute 78. Install light fitting with reflectors for Earth resistance and earth leak-
Skill 45Hrs.; electrical illumina- direct and indirect lighting. (10 Hrs.) age circuit breaker. (5 Hrs.)
tion system and 79. Group different wattage of lamps in Laws of Illuminations.
test.
Professional (NOS: N/A) series for specified voltage. (5 Hrs.) Types of illumination system.
Know ledge 80. Practice installation of various lamps Illumination factors, intensity of
10Hrs. e.g. fluorescent tube, HP mercury va- light.
pour, LP mercury vapour, HP sodium
vapour, LP sodium vapour, metal Type of lamps, advantages/ dis-
halide etc. (18 Hrs.) advantages and their applications.
81. Prepare decorative lamp circuit to
produce rotating light effect/running
light effect. (6 Hrs.)
82. Install light fitting for show case light-
ing. (6 Hrs.)
Professional Select and perform 83. Practice on various analog and digi- Calculations of lumens and ef-
Skill 50 Hrs.; measurements us- tal measuring Instruments. (5 Hrs.) ficiency. (10 hrs.)
ing analog / digital 84. Practice on measuring instruments Classification of electrical instru-
instruments and in single and three phase circuits ments and essential forces re-
Professional install/ diagnose e.g. multi-meter, Wattmeter, Energy quired in indicating instruments.
Knowledge smart meters. meter, Phase sequence meter and
08 Hrs. Frequency meter etc. (12Hrs.) PMMC and Moving iron instru-
(NOS: PSS/ ments.
N1707) 85. Measure power in three phase cir-
cuit using two wattmeter methods. Measurement of various electrical
(8 Hrs.) parameters using different analog
and digital instruments.
86. Measure power factor in three phase
circuit by using power factor meter Measurement of energy in three
and verify the same with voltmeter, phase circuit.
ammeter and wattmeter readings. Automatic meter reading infra-
(10Hrs.) structures and Smart meter.
87. Measure electrical parameters using Concept of Prosumer and distrib-
tong tester in three phase circuits. uted generation.
(08Hrs.)
Electrical supply requirements of
88. Demonstrate Smart Meter, its physi- smart meter, Detecting/clearing
cal components and Communica-
tion components. (03 Hrs.)
89. Perform meter readings, install and
diagnose smart meters. (04 Hrs.)
(xx)