72. Practice wiring of hostel and residen-
                                            tial building as per IE rules. (15 Hrs.)

                                          73. Practice wiring of institute and work-
                                            shop as per IE rules. (15 Hrs.)
                                          74. Practice testing / fault detection of
                                            domestic and industrial wiring instal-
                                            lation and repair. (15Hrs.)

        Professional   Plan  and  prepare   75. Prepare pipe earthing and measure   Special wiring circuit e.g. godown,
        Skill 25 Hrs.;  Earthing  installa-  earth  resistance  by  earth  tester  /   tunnel and workshop etc. (14 Hrs.)
                      tion.                 megger. (10 Hrs.)                 Importance of Earthing.
        Professional   (NOS: PSS/         76. Prepare plate earthing and measure  Plate  earthing  and  pipe  earthing
        Knowledge     N6002)                earth  resistance  by  earth  tester  /  methods and IEE regulations.
        07 Hrs.                             megger. (10 Hrs.)
                                          77. Test  earth  leakage  by  ELCB  and
                                            relay. (5 Hrs.)
        Professional  Plan and execute   78. Install light fitting with reflectors for  Earth resistance and earth leak-
        Skill 45Hrs.;  electrical illumina-  direct and indirect lighting. (10 Hrs.)  age circuit breaker. (5 Hrs.)
                       tion  system  and   79. Group different wattage of lamps in  Laws of Illuminations.
                       test.
        Professional   (NOS: N/A)           series for specified voltage. (5 Hrs.)  Types of illumination system.
        Know ledge                       80. Practice installation of various lamps   Illumination  factors,  intensity  of
        10Hrs.                              e.g. fluorescent tube, HP mercury va-  light.
                                            pour, LP mercury vapour, HP sodium
                                            vapour,  LP  sodium  vapour,  metal  Type of lamps, advantages/ dis-
                                            halide etc. (18 Hrs.)             advantages and their applications.
                                         81. Prepare  decorative  lamp  circuit  to
                                            produce rotating light effect/running
                                            light effect. (6 Hrs.)
                                         82. Install light fitting for show case light-
                                            ing. (6 Hrs.)

        Professional  Select and perform   83. Practice on various analog and digi-  Calculations  of  lumens  and  ef-
        Skill 50 Hrs.;  measurements us-    tal measuring Instruments. (5 Hrs.)  ficiency. (10 hrs.)
                      ing analog / digital   84. Practice on measuring instruments   Classification of electrical instru-
                      instruments  and      in single and three phase circuits   ments  and  essential  forces  re-
        Professional  install/  diagnose    e.g. multi-meter, Wattmeter, Energy   quired in indicating instruments.
        Knowledge  smart meters.            meter, Phase sequence meter and
        08 Hrs.                             Frequency meter etc. (12Hrs.)     PMMC  and  Moving  iron  instru-
                      (NOS:  PSS/                                             ments.
                      N1707)             85. Measure power in three phase cir-
                                            cuit using two wattmeter methods.   Measurement of various electrical
                                            (8 Hrs.)                          parameters using different analog
                                                                              and digital instruments.
                                         86. Measure power factor in three phase
                                            circuit by using power factor meter   Measurement of energy in three
                                            and verify the same with voltmeter,   phase circuit.
                                            ammeter and wattmeter readings.   Automatic  meter  reading  infra-
                                            (10Hrs.)                          structures and Smart meter.
                                         87. Measure electrical parameters using   Concept of Prosumer and distrib-
                                            tong tester in three phase circuits.   uted generation.
                                            (08Hrs.)
                                                                              Electrical supply requirements of
                                         88. Demonstrate Smart Meter, its physi-  smart  meter,  Detecting/clearing
                                            cal components and Communica-
                                            tion components. (03 Hrs.)

                                         89. Perform meter readings, install and
                                            diagnose smart meters. (04 Hrs.)