Page 22 - Electrician 1st year - TP - Kannada
P. 22

Professional   Perform  testing,  90. Practice  for  range  extension  and   Errors and corrections in measure-
        Skill 25 Hrs.;  verify  errors  and   calibration  of  various  measuring   ment.
                       calibrate  instru-   instruments. (10 Hrs.)
                       ments.            91. Determine errors in resistance mea-  Loading  effect  of  voltmeter  and
        Professional   (NOS: N/A)           surement by voltage drop method.   voltage drop effect of ammeter in
        Knowledge                           (8 hrs)                          circuits.
        05Hrs.                                                               Extension of range and calibration
                                         92. Test single phase energy meter for   of measuring instruments. (05 hrs.)
                                            its errors. (7 Hrs.)

        Professional  Plan and carry out   93. Dismantle and assemble electrical   Working principles and circuits of
        Skill 75 Hrs.;  installation,  fault   parts  of  various  electrical  appli-  common domestic equipment and
                      detection  and  re-   ances e.g. cooking range, geyser,   appliances.
                      pairing of domestic   washing machine and pump set.     Concept  of  Neutral  and  Earth.
        Professional  appliances.           (25 Hrs.)                         (10 hrs.)
        Knowledge     (NOS: PSS/N6003)   94. Service and repair of electric iron,
        10 Hrs.                             electric kettle, cooking range and
                                            geyser. (12 Hrs.)
                                         95. Service  and  repair  of  induction
                                            heater and oven. (10 Hrs.)
                                         96. Service  and  repair  of  mixer  and
                                            grinder. (10 Hrs.)

                                         97. Service and repair of washing ma-
                                            chine. (13Hrs.)

        Professional  Execute  testing,   98. Verify terminals, identify components  Working  principle,  construction
        Skill 75 Hrs.;  evaluate  perfor-   and calculate transformation ratio of  and classification of transformer.
                      mance and main-       single-phase transformers. (8 Hrs.)
                      tenance of trans-                                      Single  phase  and  three  phase
        Professional  former.            99. Perform OC and SC test to determine  transformers.
        Knowledge 12                        and efficiency of single-phase trans-  Turn ratio and e.m.f. equation.
        Hrs.          (NOS: PSS/            former. (12Hrs.)
                      N2406, PSS/                                            Series  and  parallel  operation  of
                      N2407)             100  Determine  voltage  regulation  of   transformer.
                                            single-phase transformer at different
                                            loads and power factors. (12 Hrs.)  Voltage Regulation and efficiency.
                                         101 Perform series and parallel opera-  Auto Transformer and instrument
                                            tion of two single phase transformers.  transformers (CT & PT). (12 Hrs.)
                                            (12 Hrs.)
                                         102 Verify the terminals and accessories
                                            of three phase transformer HT and LT
                                            side. (6Hrs.)
                                         103Perform 3 phase operation (i) delta-  Method of connecting three single
                                            delta, (ii) delta-star, (iii) star-star,   phase  transformers  for  three
                                                                              phase operation.
                                         (iv)  star-delta  by  use  of  three  single
                                            phase transformers. (6 Hrs.)      Types of Cooling, protective devic-
                                                                              es, bushings and termination etc.
                                         104Perform  testing  of  transformer  oil.
                                            (6 Hrs.)                          Testing of transformer oil.
                                         105Practice on winding of small trans-  Materials  used  for  winding  and
                                            former. (8 Hrs.)                  winding wires in small transformer.
                                         106Practice of general maintenance of  (06 Hrs.)
                                            transformer. (5 Hrs.)








                                                        (xx)
   17   18   19   20   21   22   23   24   25   26   27