Page 18 - Fitter 2nd Year TT - Telugu
P. 18

Professional  Plan, erect simple  193. Inspection of Machine tools such as  Lubrication and lubricants- purpose
        Skill 75 Hrs;  machine and test    alignment, levelling. (10 hrs.)   of using different types, description
        Professional  machine     tool  194. Accuracy testing of Machine tools  and uses of each type. Method of
        Knowledge    accuracy. [Simple     such  as  geometrical  parameters.  lubrication.  A good lubricant,
        16Hrs        Machines – Drill      (15 hrs.)                         viscosity of the lubricant, Main
                     Machine, Power                                          property of lubricant. How a film of
                     Saw and Lathe]                                          oil is formed in journal Bearings. (04
                                                                             hrs.)

                                        195. Practicing, making various knots,  Foundation bolt: types (Lewis
                                            correct loading of slings, correct and  cotter bolt) description of each
                                            safe removal of parts. (5 hrs.)   erection tools, pulley block,
                                                                              crowbar, spirit level, Plumb bob, wire
                                        196. Erect simple machines. (45 hrs.)
                                                                              rope, manila rope, wooden block.
                                                                              The use of lifting appliances,
                                                                              extractor presses and their use.
                                                                              Practical method of obtaining
                                                                              mechanical advantage. The slings
                                                                              and handling of heavy machinery,
                                                                              special precautions in the removal
                                                                              and replacement of heavy parts.
                                                                              (12 hrs.)



                           Scan the QR Code to view the video for these exercise

                                Scan the QR Code to view the video for these exercise
                                         Module 1 - Ex.No. 2.1.115 to 2.1.138
                                                    MODULE 1






              Screw drivers                       Locking devices - Nuts -          Template and gauges
                                                  Types
                   Ex. No. 2.1.116 - 118
                                                     Ex.No.2.1.119
                                                                                         Ex.No.2.1.123
            Ex.No.2.1.116-118                      Ex. No. 2.1.119               Ex. No. 2.1.123
                     MODULE 2
                                                                                        Module 6
                                                      Module 3
               Module 2                             MODULE 3                       MODULE 6
          Ex.No. 2.2.139 to 2.2.148             Ex.No. 2.3.149 to 2.3.156           Ex.No. 2.6.171 to 2.7.186





                     Ex. No. 2.2.139              Ex. No. 2.3.149 - 152          Ex. No. 2.6.178
                 Gauges                           Pipes and pipe fittings          Non-return valve/check valve
              Ex.No.2.2.139                         Ex.No.2.3.149-152                   Ex.No.2.6.178


















                                                        (xvi)
                                                        (xvi)
   13   14   15   16   17   18   19   20   21   22   23