Page 15 - Fitter - 2nd Yr TP - Telugu
P. 15

tasting surfaces quality –
                                                                                   dimensional tolerances of surface
                                                                                   finish. (06 hrs.)

                                             130. Prepare Stepped keyed fitting and  Honing: Application of honing,
                                                  test job. (16 hrs.)              material for honing, tools shapes,
                                                                                   grades, honing abrasives. Frosting-
                                             131. Lapping holes and cylindrical    its aim and the methods of
                                                 surfaces. (5 hrs.)
                                                                                   performance. (05 hrs.)
                                             132. Dovetail and Dowel pin assembly. (16  Metallurgical and metal working
                                                 hrs.)                             processes such as Heat treatment,
                                                                                   various heat treatment methods -
                                             133. Scrape cylindrical bore. (5 hrs.)
                                                                                   normalizing, annealing, hardening
                                                                                   and tempering, purpose of each
                                                                                   method, tempering colour chart. (06
                                                                                   hrs.)
                                             134. Scrapping cylindrical bore and to  Annealing and normalizing, Case
                                                 make a fit-(12 hrs.)              hardening and carburising and its
                                                                                   methods, process of carburising
                                             135. Scrapping cylindrical taper bore and  (solid, liquid and gas). (07 hrs.)
                                                 check taper angle with sine bar. (08
                                                 hrs.)

                                             136. Make a cotter jib assembly. (20 hrs.)  Tapers on keys and cotters
                                                                                   permissible by various standards.
                                                                                   (06 hrs.)

                                             137. Hand reams and fit taper pin. (12  The various coatings used to protect
                                                 hrs.)                             metals, protection coat by heat and
                                                                                   electrical deposit treatments.
                                             138. Drilling and reaming holes in correct
                                                 location, fitting dowel pins, stud, and  Treatments to provide a pleasing
                                                 bolts. (08 hrs.)                  finish such as chromium silver
                                                                                   plating, nickel plating and
                                                                                   galvanizing. (05hrs.)

             Professional  Make different    139. Making a snap gauge for checking  Gauges and types of gauge
             Skill 113Hrs;  gauges by using      a dia. of 10 ±                    commonly used in gauging finished
             Professional  standard tools &                                        product-Method of selective
             Knowledge     equipment and                                           assembly ‘Go’ system of gauges,
             30Hrs         checks       for                                        hole plug basis of standardization.
                           specified                                               (06 hrs.)
                           accuracy .
                           [Different Gauges  140. Scrape external angular mating  Bearing-Introduction, classification
                           – Snap gauge, Gap      surface and check angle with sine  (Journal and Thrust), Description of
                           gauge; Specified       bar. (15 hrs.)                   each, ball bearing: Single row,
                           Accuracy       -  141. Scrape on internal surface and check.  double row, description of each, and
                           ±0.02mm]             (10 hrs.)                          advantages of double row. (06 hrs.)
                           (Mapped
                           NOS:CSC/N0304)    142. Practice in dovetail fitting assembly  Roller and needle bearings: Types
                                                 and dowel pins and cap screws     of roller bearing.
                                                 assembly. (16 hrs.)
                                                                                   Description & use of each. Method
                                             143. Industrial visit. (5 hrs.)       of fitting ball and roller bearings
                                                                                   (06 hrs.)

                                             144. Preparation of gap gauges. (12 hrs.)  Bearing metals – types,
                                                                                   composition and uses.
                                             145. Perform lapping of gauges (hand
                                                      lapping only) (10 hrs.)      Synthetic materials for bearing: The
                                                                                   plastic laminate materials, their

                                                              (xiii)
   10   11   12   13   14   15   16   17   18   19   20