Page 20 - Fitter - 2nd Yr TP - Telugu
P. 20

Professional  Plan, erect simple  193. Inspection of Machine tools such as  Lubrication and lubricants- purpose
       Skill 75 Hrs;  machine and test     alignment, levelling. (10 hrs.)   of using different types, description
       Professional  machine     tool  194. Accuracy testing of Machine tools  and uses of each type. Method of
       Knowledge     accuracy. [Simple     such as geometrical parameters.   lubrication.  A good lubricant,
       16Hrs         Machines – Drill      (15 hrs.)                         viscosity of the lubricant, Main
                     Machine, Power                                          property of lubricant. How a film of
                     Saw and Lathe]                                          oil is formed in journal Bearings. (04
                                                                             hrs.)

                                        195. Practicing, making various knots,  Foundation bolt: types (Lewis
                                           correct loading of slings, correct and  cotter bolt) description of each
                                           safe removal of parts. (5 hrs.)   erection tools, pulley block,
                                                                             crowbar, spirit level, Plumb bob, wire
                                        196. Erect simple machines. (45 hrs.)
                                                                             rope, manila rope, wooden block.
                                                                             The use of lifting appliances,
                                                                             extractor presses and their use.
                                                                             Practical method of obtaining
                                                                             mechanical advantage. The slings
                                                                             and handling of heavy machinery,
                                                                             special precautions in the removal
                                                                             and replacement of heavy parts.
                                                                             (12 hrs.)



                           Scan the QR Code to view the video for these exercise

                                         Module 1 - Ex.No. 2.1.115 to 2.1.138









          File & fit angular mating surface   Drill through and blind holes  Make dovetailed fitting and radius
          within an accuracy of ± 0.02 mm       at an angle using swivel                 fitting
            & 10 minutes angular fitting        table of drilling machine
                                                                                     Ex.No.2.1.123
                Ex.No.2.1.120                     Ex.No.2.1.121








         Prepare stepped keyed fitting and     Scrape cylindrical bore          Drilling and reaming holes in
                    test job                                                    correct location, fitting dowel
                                                                                    pins, stud and bolts
                Ex.No.2.1.130                      Ex.No.2.1.133                     Ex.No.2.1.138

                                        Module 2 - Ex.No. 2.2.139 to 2.2.148








              Making a snap gauge for checking                      File and fit straight and angular
                   a dia. of 10 ± 0.02mm                                 surfaces internally
                      Ex.No.2.2.139                                       Ex.No.2.2.147

                                                       (xviii)
   15   16   17   18   19   20   21   22   23   24   25