Page 16 - Plumber- TT - 1st Year - Tamil
P. 16

Professional                      38 PVC Pipe welding various dia,
       Knowledge                            using welding machine.(13hrs)
       08Hrs                             39 Weld various type of PVC Pipe
                                            with various dia, using welding
                                            machine. (5hrs)
                                         40 PPR pipe welding joint various
                                            dia of pipe using welding
                                            machine.(5hrs)
       Professional  Construct complete 41 CI/HCI Pipe Flange joint with  •  Types of fittings for different joints & dif-
       Skill 25Hrs;  pipe line circuit with dif-  Bend and Tee.(5hrs)     ferent pipes.:- CI,HCI,AC,AC Pressure,
                    ferent types of Joints 42 Socket joint of CI Pipes with  DI, GI Pipes. Joints:- Flange joint, Socket
       Professional  and fixing Cocks & valve  lead. (5hrs)               joint with lead, Detachable joint, Socket
       Knowledge    on     Pipe     line. 43 Detachable joint of AC pressure  & Spigot joints etc.
       08Hrs        (NOS:PSC/NO133)         Pipe. (5 hrs)              •  Description of pipe fittings.
                                         44 Titan/Socket & Spigot joint of  •  Methods of joining and their uses.
                                            Ductile Iron (DI) Pipe with Rub-  •  Precautions to be taken while fixing
                                            ber ring.(4hrs)               (08hrs)
                                         45 Prepare and Study the drawing
                                            of Pipe line circuit and sched-
                                            ule use of  Tools and
                                            accessories.(2hrs)
                                         46 Make a Pipe line circuit on GI
                                            Pipe with Socket, Elbow, Bend,
                                            Flange, Tee, Union etc. And
                                            Fixing Cocks & Valves as per
                                            drawing. (4hrs)
       Professional Carry out Cutting of Dif- 47 PVC pipe cutting & shaping in •  Different kinds of Joints, Fittings and
       Skill 25Hrs;  ferent  Types of PVC   various dia, using Hacksaw and  Materials in joining pipes:- PVC/CPVC,
                    Pipe, joining and laying.  Pipe cutters. (10 hrs)     PPR and HDPE etc. (08hrs)
       Professional (NOS:PSC/NO133)      48 Preparation of PVC pipe and
       Knowledge                            Fittings with emery paper.(5hrs)
       08Hrs                             49 Use & fixing of PVC fittings use
                                            Solvent Cement etc. (5hrs)
                                         50 Layout of PVC pipe according
                                            to drawing. (5hrs)
       Professional Perform Water analysis 51 Preparation of Water and Wa- Composition of Water:-
       Skill 25Hrs;  test, Water Pressure   ter analysis kit. (1 hr)   •  Sources of water
                    test and                  Water 52 Water Analysis Test by Analy- •  Hard & Soft water, temporary hardness
       Professional distribution system by  sis Kits. pH, TDS,Temperature  &permanent hardness.
       Knowledge using       Pipe   line.   etc. (4hrs)                •  Impurities of water - organicand inorganic
       08Hrs        (NOS:PSC/NO133)      53 Preparation of Hydraulic Pres-  impurities.
                                            sure Test Machine. (1 hr)  •  Water purification stages and methods.
                                         54 Static water pressure test by •  Static water pressures and measure-
                                            Hydraulic Pressure Test Ma-   ment of pressures. Bursting pressure,
                                            chine apply on Plastic Water •  Expansion of water on freezing and heat-
                                            bottle.(4hrs)                 ing.
                                         55 Static water pressure test by •  Bernoulli's principles
                                            Hydraulic Pressure Test Ma- •  Pascal's law.
                                            chine apply on Cistern and •  Pressure of water on the sides of cistern
                                            Tank.(4hrs)                   or tank.
                                         56 Steps of simple pipe line con- •  Water hammer in pipes.
                                            nection as per drawing. (3 hrs) •  Description and working of water ham-
                                         57 Make a pipe line for water dis-  mer arrester. (08hrs)
                                            tribution as per drawing. (4hrs)
                                         58 Make a pipe line for OHR wa-
                                            ter distribution system as per
                                            drawing. (02hrs)
                                         59 Installation of water hammer
                                            arrester. (02 hrs)


                                                        (xiv)
   11   12   13   14   15   16   17   18   19   20   21