Page 17 - Plumber- TT - 1st Year - Tamil
P. 17

Professional Align and layhumid as- 60 Interpret drawing of sanitary plumb-  •  Use of hummed and asbestos
             Skill 45Hrs;   bestos pipe line of dif-  ing. (08hrs)                    pipes of different sizes.
                            ferent dia. and fitting & 61 Lay & align hummed pipe. (05hrs)  •  Method of laying out pipes align-
             Professional maintenance of drain- 62 Demonstrate use of specificdia in  ment and joining. (05hrs)
             Knowledge age         pipe    line.    different location. (04hrs)
             10Hrs          (NOS:PSC/NO135)
                                                 63 Use various sanitary fitting. (06hrs) •  Description of various pipe joints-
                                                 64 Use various fitting of different ma-  straight, Branch, Taft and blow,
                                                    terials. (06hrs)                  Expansion joints. Solders and
                                                 65 Use joining materials of pipe.    fluxes used in joints. (05hrs)
                                                    (10hrs)
                                                 66 Join pipe as per laid down Proce-
                                                    dure. (06hrs)
             Professional Install and maintain dif- 67 Demonstrate use of different pump. •   Description of Plumber's materi-
             Skill 60Hrs;   ferent Electric pumps.  (10 hrs)                          als Lead, tin, Zinc, solder, cop-
                            (NOS:PSC/NO135)      68 Demonstrate installation of electric  per, red lead etc. and their uses.
             Professional                           pump (10 hrs)                  •  Water supply system of a small
             Knowledge                           69 Demonstrate maintenance of elec-  town.
             10Hrs                                  tric pump. (10 hrs)            •  Description and types of pumps
                                                 70 Demonstrate working process of    viz. suction pump, Centrifugal
                                                    centrifugal, reciprocating, submers-  pump etc. Contamination of wa-
                                                    ible pump. (15 hrs)               ter in a well. (10hrs)
                                                 71 Demonstrate delivery of water to
                                                    overhead tank through pump,
                                                    presser head, delivery pipe, suction
                                                    pipe, etc, (15 hrs)
             Professional Join fittings for different 72 Produce BSP thread on pipe. (05 •  Description of pipe dies, their
             Skill 30Hrs;   purposes on PVC pipe    hrs)                              uses, care and precaution.
                            line.                73 Produce Internal and external •   Metric specification of various
             Professional (NOS:PSC/NO133)           thread on PVC pipes of different dia.  pipes.
             Knowledge                              (05 hrs)                       •  Standard pipe threads.
             06Hrs                               74 Join PVC pipe with thread. (05hrs) •  Method employed for bending,
                                                 75 Join PVC pipe with solvent cement  Joining and fixing PVC pipe.
                                                    and heat process(05hrs)        •  Joining material for water and
                                                 76 Join PVC pipe as per layout. (10hrs)  gas pipes.
                                                                                   •  Use of blow lamp. (06hrs)
             Professional Constructinspection 77 Demonstrate inspection chamber, •    Inspection chamber, septic tank,
             Skill 25Hrs;   chamber, manhole, gut-  manhole, gully trap, septic tank,  description of drains, cesspools,
                            ter, septic tank, socket  soak pit. (04 hrs)              soak pits etc.
             Professional etc. (NOS:PSC/NO135) 78 Construct inspection chambers, •    Types of traps
             Knowledge                             cesspool, septic tank, soak pit etc. •  layout of drainage system (07
             07 Hrs                                (21 hrs)                           hrs)
             Professional Test pipe line as per site 79 Demonstrate drawing layout of drain- •  Method of bending pipes by hot
             Skill 25Hrs;   drainage pipe line lay-  age pipe line. (06 hrs)          and cold process.
                            out. (NOS:PSC/NO135) 80 Perform testing for smoke test, wa- •  Method of testing drainage lines
             Professional                          ter test, smell test, ball test mirror  (05hrs)
             Knowledge                             test. (10 hrs)
             05Hrs                               81 Join heavy cast iron socket pipe.
                                                   (03 hrs)
                                                 82 Sealing of heavy cast iron pipe joint
                                                   with lead & caulking tools. (06 hrs)
             Professional Perform removal of leak- 83 Identify location of leakage pipe.  •  Method of dismantling and re-
             Skill 25Hrs;   age in pipe line.      (06 hrs)                           newal of the valves and pipes.
                            (NOS:PSC/NO133)      84 Removing out leakages pipe.       Leaks in pipes and noises in
             Professional                          (10 hrs)                           plumbing.
             Knowledge                           85 Removing of air locks (06 hrs)  •  Installation of water meters. Air
             04Hrs                               86 Demonstrate rain water harvesting  lock in pipes and its removal.
                                                   system. (03 hrs)                   (04hrs)



                                                              (xv)
   12   13   14   15   16   17   18   19   20   21   22