Professional Perform Root pass welds 81.Root welding of pipes (schedule 40) - Procedure for welding heavy wall
Skill 123Hrs; in Weld single Vee butt in 5G position. pipes in 6G position welding
joints on schedule 40 pipes
Professional in 1G, 2G and 5G positions 82.Intermediate and cover pass
Knowledge by GTAW. (Mapped NOS: welding in 5G position.
24Hrs
CSC/N0212) 83.Inspection and clearance using LPI
testing.
84.Root welding of pipes (schedule 40) - Welding symbols Procedure for
in 5G position welding of thin wall pipes in
downhill position.
85.Intermediate and cover pass
welding in 5G position. - Procedure forwelding pipes in
2G position.
86.Inspection and clearance
using LPI testing.
87.Beading practice by TIG on MS - Welding procedure for
sheets. complicated pipe joint, T- joints
with intersection.
88.Square butt joint on M.S. sheet in
flat position. - Top, Bottom and Side - Y joint
etc.
89.Square butt joint on M.S. sheet in
flat position.
90.Inspection and clearance using LPI
testing.
91.Square butt joint on M.S. sheet in - Introduction to GTAW welding -
2G position. Advantages, Equipment -
Electrode.
92.Inspection and clearance
using LPI testing.
93.Square butt joint on M.S. sheet in
3G position.
94.Inspection and clearance using LPI
testing.
95.Square butt joint on M.S. sheet in - Shielding Gas and Advantage of
4G position. root pass welding by GTAW.
96.Inspection and clearance
using LPI testing.
97.Root pass welding of - Importance of preheating, post
pipes(schedule 40) 1G positions by heating and post weld heat
TIG. treatment
98.Inspection and clearance using LPI - Welding metallurgy - weld
testing. stress
99.Root pass welding of pipes - Distortion and control.
(schedule 40) 2G positions by TIG. - Correction of distorted
section.
100.Inspection and clearance using LPI
testing.
Professional Perform Root pass welds in 101.Root pass welding of pipes - Introduction to GMAW & Flux
Skill 85Hrs; Weld single Vee butt joints (schedule 60) 5G positions by TIG. cored arc welding - Equipment,
on schedule 60 pipes and accessories, Advantages
Professional schedule 80 pipes in 6G 102.Inspection and clearance using LPI
Knowledge positions by GTAW testing. and Limitations.
16Hrs
and intermediate and cover 103.Root pass welding of pipes
pass weld by SMAW. (schedule 60) 6G positions by TIG.
(Mapped NOS: CSC/ 0212) 104.Inspection and clearance
using LPI testing.