74.Practice  leveling with different   •  Contouring    ;-Definition,
                                          instruments. (04 hrs.)                 Characteristics, Methods.
                                       75.Check levelling. (04 hrs.)          •  Direct and Indirect methods
                                       76.Profile levelling or Longitudinal, plotting  •   Interpolation of Contour,
                                          the profile.   (03 hrs.)               Contour  gradient , Uses of
                                                                                 Contour plan and Map.
                                       77.Surveying of a building site with chain
                                          and Levelling Instrument with a view to  •  Knowledge on road project. (12
                                          computing earth work. (04 hrs.)        hrs.)
                                       78.Contour -  Direct and Indirect methods.
                                          (03 hrs.)

                                       79.Make Topography map, contours map.
                                          (04 hrs.)
                                       80.Solve trigonometric problems. (03 hrs.)

                                       81.Prepare a road project in a certain
                                          alignment. (04 hrs.)
        Professional   Perform a site   Theodolite survey:-                  Theodolite survey:-
        Skill 56 Hrs;  survey with
                       Theodolite and   82.Field work of theodolite. (05 hrs.)  •  Introduction.
        Professional   prepare site
        Knowledge      plan.            83.Horizontal angle. (05 hrs.)       •  Types of   theodolite.
        12 Hrs                          84.Vertical angle. (05 hrs.)         •  Uses, Methods of Plotting.

                                        85.Magnetic bearing of a line. (05 hrs.)  •  Transit vernier theodolite.
                                        86.Levelling with a theodolite. (05 hrs.)  •  Terms of transit theodolite.
                                        87.Calculation of area from traverse. (04  •  Fundamental line of theodolite.
                                           hrs.)
                                                                             •  Adjustment of theodolite.
                                        88.Determination of Heights. (06 hrs.)
                                                                             •  Checks, Adjustment of errors.
                                        89.Calculation of departure, latitude,
                                           northing and easting- ( 5hrs)     •  Open and closed traverse and
                                                                                their application to Engineering
                                        90.Setting out work-Building,culvert,   Problems.
                                           centre line of Dams,Bridges and Slope
                                           of Earth work, etc. (16hrs)       •  Vernier scale- types.
                                                                             •  Measurement of horizontal angle.
                                                                             •  Measurement of vertical angle.

                                                                             •  Adjustment of a close traverse.
                                                                             •  Problems in transit theodolite-
                                                                                departure, latitude, northing and
                                                                                easting. (12 hrs.)