Page 19 - Draughtsman Civil - TP - Hindi
P. 19
• Wireman's tools kit. Wiring
materials. Electrical fittings.
• System of wirings. Wiring
installation for domestic lightings
(06 hrs.)
Professional Draw types of Drawing details of:- • Floors - Ground floor & upper
Skill 28Hrs; ground and 58.Types of ground & upper floors. (14hrs) floor-Types.
upper floors.
Professional 59.Various floor finishing, sequence of • Flooring- materials used types.
Knowledge construction. (14hrs) (06 hrs.)
06Hrs
Professional Draw different Drawing different forms of vertical • Stairs:- Terms.
Requirements,Planning and
Skill 56Hrs; types of vertical movements:-
movement designing of stair and details of
Professional according to 60.As per shape - Drawing of straight, construction.
Knowledge shape, location, open newel, dog- legged, geometrical • Basic concept of lift and
12Hrs materials by and bifurcated stairs & spiral stairs. Escalator (12 hrs.)
using stair, lift, (18hrs)
ramp and 61.As per material - brick, stone,
escalator. wooden, steel & RCC stairs. (20 hrs)
62.Drawing of Lift and Escalator. (18hrs)
Professional Draw different Drawing details of:- Roofs & Roof coverings: -
Skill56Hrs; types of roofs, 63.Slopped/Pitched Roof Truss - • purposes,Elements, Types, Fla,
truss according
Professional to shape, King Post and Queen Postroof trusses pitched.
Knowledge construction, showing detailed connections. (23hrs) • Truss-king post, queen post,
18Hrs
purpose and 64.Steel roof trusses showing detailed mansard, bel-fast, steel,
span connections. (21hrs) composite.
65.Wooden roof truss, showing detailed • Roof & coverings - objectives,
connections. (12hrs) types & uses. (18 hrs.)
Professional M a k e Levelling:- (03 hrs.) Levelling:-
Skill 56Hrs; tropography 66.Handling of levellinginstruments&
Professional map by contours their settings(04 hrs.) • Auto level , dumpy Level, Tilting
Level - introduction, definition
Knowledge with leveling
12Hrs instruments. 67.Temporary adjustment of alevel. (03 • Principle of levelling.
hrs.)
• Levelling staffs, its graduation &
68.Simple levelling. types.
69.Differential levelling (Fly levelling). (03 • Minimum equipment required
hrs.)
• Types,component / part and
70.Carry out Levelling field book. (03 function.
hrs.)
• Temporary and permanent adjust
71.Equate Reduction of levels - Height ment, procedure in setting up.
of collimation and Riseand Fall
method - Comparisonof methods. (04 • Level& horizontal surface.
hrs.) Datum Benchmark, Focussing&
parallax
72.Solve problems on reduction of
levels. (03 hrs.) • Deduction of levels / Reduced
Level.
73.Calculate Missing data and how to
fill it up-calculations • Types of leveling, Application to
&Arithmaticalcheckin various chain and Levelling Instrument to
problems and its solution. (04 hrs.) Building construction.
(xvii)