•   Wireman's tools kit. Wiring
                                                                                     materials. Electrical fittings.
                                                                                  •  System of wirings. Wiring
                                                                                     installation for domestic lightings
                                                                                     (06 hrs.)

              Professional  Draw types of    Drawing details of:-                  •  Floors - Ground floor & upper
              Skill 28Hrs;  ground    and    58.Types of ground & upper floors. (14hrs)  floor-Types.
                            upper floors.
              Professional                   59.Various floor finishing, sequence of  •   Flooring- materials used types.
              Knowledge                         construction. (14hrs)                 (06 hrs.)
              06Hrs

              Professional  Draw different   Drawing different forms of vertical   •  Stairs:-            Terms.
                                                                                      Requirements,Planning and
              Skill 56Hrs;  types of vertical   movements:-
                            movement                                                  designing of stair and details of
              Professional  according to     60.As per shape - Drawing of straight,   construction.
              Knowledge     shape, location,    open newel,  dog- legged, geometrical  •  Basic concept of lift and
              12Hrs         materials by        and bifurcated stairs & spiral stairs.  Escalator  (12 hrs.)
                            using stair, lift,  (18hrs)
                            ramp      and    61.As per material - brick, stone,
                            escalator.          wooden, steel & RCC stairs. (20 hrs)

                                             62.Drawing of Lift and Escalator. (18hrs)

              Professional  Draw different   Drawing details of:-                  Roofs & Roof coverings: -
              Skill56Hrs;   types of roofs,  63.Slopped/Pitched Roof Truss -       •  purposes,Elements, Types, Fla,
                            truss according
              Professional  to     shape,    King Post and Queen Postroof trusses     pitched.
              Knowledge     construction,       showing detailed connections. (23hrs)  •  Truss-king post, queen post,
              18Hrs
                            purpose and      64.Steel roof trusses showing detailed   mansard, bel-fast, steel,
                            span                connections. (21hrs)                  composite.
                                             65.Wooden roof truss, showing detailed  •  Roof & coverings - objectives,
                                                connections. (12hrs)                  types  & uses. (18 hrs.)
             Professional   M    a   k   e   Levelling:- (03 hrs.)                 Levelling:-
             Skill 56Hrs;   tropography      66.Handling of levellinginstruments&
             Professional   map by contours     their settings(04 hrs.)            •  Auto level , dumpy Level, Tilting
                                                                                     Level - introduction, definition
             Knowledge      with leveling
             12Hrs          instruments.     67.Temporary adjustment of alevel. (03  •  Principle of levelling.
                                                hrs.)
                                                                                   •  Levelling staffs, its graduation  &
                                             68.Simple levelling.                    types.
                                             69.Differential levelling (Fly levelling). (03  •  Minimum equipment required
                                                hrs.)
                                                                                   •  Types,component / part and
                                             70.Carry out Levelling field book. (03  function.
                                                hrs.)
                                                                                   •  Temporary and permanent adjust
                                             71.Equate Reduction of levels - Height  ment, procedure in setting up.
                                                of collimation and Riseand Fall
                                                method - Comparisonof methods. (04  •  Level& horizontal surface.
                                                hrs.)                                Datum Benchmark, Focussing&
                                                                                     parallax
                                             72.Solve problems on reduction of
                                                levels. (03 hrs.)                  •  Deduction of levels / Reduced
                                                                                     Level.
                                             73.Calculate Missing data and how to
                                                fill    it     up-calculations     •  Types of leveling, Application to
                                                &Arithmaticalcheckin various         chain and Levelling Instrument to
                                                problems and its solution. (04 hrs.)  Building construction.



                                                             (xvii)