Professional  Perform site      Surveying:-                          Surveying:-
        Skill 84Hrs;  survey    with    Chain Survey :- (35 hrs.)            •  Introduction, History and
                      chain / tape and
        Professional  prepare site      41.Equipment and instrument used to     principles of chain survey.
        Knowledge     plan.                perform surveying.(06hrs)         •  Instrument employed.
        18Hrs
                      Perfom     site   42.Distance measuring with chainand  •  Use, care, maintenance and
                      survey using         tape. (08hrs                         common terms.
                      prismatic         43.Entering Field book and plotting.  •  Classification, accuracy, types.
                      compassand           (05hrs)
                      prepare site                                           •  Main divisions (plane &
                      plan.             44.Calculating the area of site. (07hrs)  geodetic).
                      Lo 14 ,15to 18    45.Prepare site planwith the helpof  •  Chaining.
                                           Mouza map. (09hrs
                      Perform site                                           •  Speed in field and office work.
                      survey    with    Compass survey:- (42hrs)             •  Knowledge of Mouza Map.
                      plane table and   46.Field work of prismatic compass
                      prepare a map.       survey. (07hrs                    Compass survey:-
                                                                             •  Instrument and its setting up
                                        47.Plotting of prismatic compasssurvey.
                                           (05hrs                            •  Bearing and each included angle
                                                                                of close traverse.
                                        48.Testing and adjusting thecompass.
                                           (08hrs                            •  Local attraction.
                                        49.Observation of bearings. (08hrs   •  Magnetic declination and its true
                                                                                bearing.
                                        50.Bearing a line. (05hrs
                                                                             •  Precaution in using prismatic
                                        51.F.B.,B.B.,   R.B.,W.C.B.     of      compass.
                                           aLine,Traverse and also checkthe
                                           close traversing. (09hrs)         Plane table survey:-
                                        Plane Table Survey :- (07hrs)        •  Instrument used in plane table
                                                                                survey
                                        52.Surveying of a Building sitewith Plane
                                           Table. (07hrs)                    •  Care and maintenance of plane
                                                                                table (18 hrs.)

        Professional  Drawing      of   Making detailed drawing of :-        •  Carpentry      joints     :-
        Skill 28Hrs;  different types of                                        terms,classification of joints,
                      carpentry joints.  53.Carpentry joints:- lengthening, bearing,  Uses, types of fixtures ,
        Professional                       housing, framing, panelling&moulding.  fastenings.
        Knowledge     Draw different       (11hrs)
        12Hrs         types of doors                                         •  Doors -Parts, Location, standard
                      and windows       54.Different  Types doors including     sizes, types.
                      according    to      panelled, glazed and flush door.  •  Windows-types.
                      Manner       of      (11hrs)
                      construction,     55.Different types windows and       •  Ventilators-purpose-types. (12
                      Arrangement of       ventilators. (06hrs)                 hrs.)
                      component, and
                      working
                      operation

        Professional   Prepare the     Electrical Wiring:-                   Electrical Wiring:-
        Skill 28Hrs;   detailed        Prepare drawing of                    •  Safety    precaution    and
                       drawing    of
        Professional                   56.Wiring in different system.(08hrs)    elementary first aid.
        Knowledge      electrical wiring                                     •  Artificial respiration and
        06Hrs          system.         57.Electrical wiring plan with all fittings  treatment of electrical shock
                                          showing in drawing.(20 hrs)
                                                                             •  Elementary electricity.

                                                                             •  General ideas of supply system.



                                                        (xvi)