Page 24 - Content.pmd
P. 24

Professional  Plan  &  perform  108.Simple  repair  work:  Simple    Maintenance
        Skill 63 Hrs;          repair,    assembly  of  machine  parts  from
                                   of     blueprints. (10 hrs.)              -Total productive maintenance
        Professional  different machines                                     -Autonomous maintenance
        Knowledge    and  check  for    109.Rectify  possible  assembly  faults
        12Hrs        functionality.       during assembly. (14 hrs.)         -Routine maintenance
                     [Different Machines  110.Perform the routine maintenance with  -Maintenance schedule
                     -  Drill  Machine,   check list (08 hrs.)               -Retrieval  of  data  from  machine
                     Power Saw, Bench                                        manuals Preventive maintenance-
                                  and   111.Monitor  machine  as  per  routine  objective and function of Preventive
                     Lathe]N/A            checklist (3 hrs.)                 maintenance, section inspection.
                                        112.Read pressure gauge, temperature
                                          gauge, oil level (1 hr.)           Visual  and  detailed,  lubrication
                                        113.Set pressure in pneumatic system  survey,  system  of  symbol  and
                                          (2 hrs.)                           colour coding.  Revision, simple
                                                                             estimation  of  materials,  use  of
                                                                             handbooks and reference table.
                                                                             Possible  causes  for  assembly
                                                                             failures and remedies.

                                                                             Installation,  maintenance  and
                                                                             overhaul  of  machinery  and
                                                                             engineering equipment (10 hrs.)

                                        114.Assemble simple fitting using dowel  Assembling  techniques  such  as
                                           pins and tap screw assembly using  aligning, bending, fixing, mechanical
                                           torque wrench. (15 hrs.)          jointing, threaded jointing, sealing,
                                                                             and torqueing. Dowel pins: material,
                                                                             construction, types, accuracy and
                                                                             uses.  (02 hrs.)















































                                                       (xxii)
   19   20   21   22   23   24   25   26   27   28   29