Page 19 - Electrician -1st Year - TT
P. 19

Professional  Perform testing,   90.Practice for range extension and  Errors and corrections in measure-
              Skill 25 Hrs.;  verify errors and  calibration of various measuring in-  ment.
                            calibrate instru-    struments. (10 Hrs.)
                            ments.             91.Determine errors in resistance mea-  Loading effect of voltmeter and volt-
              Professional  (NOS: N/A)           surement by voltage drop method. (8  age drop effect of ammeter in cir-
              Knowledge                          hrs)                              cuits.
              05Hrs.                                                               Extension of range and calibration
                                               92.Test single phase energy meter for  of measuring instruments. (05 hrs.)
                                                 its errors. (7 Hrs.)

             Professional   Plan and carry out  93.Dismantle and assemble electrical  Working principles and circuits of
             Skill 75 Hrs.;  installation, fault de-  parts of various electrical appliances  common domestic equipment and
                            tection and repairing  e.g. cooking range, geyser, wash-  appliances.
                            of domestic appli-    ing machine and pump set. (25 Hrs.)  Concept of Neutral and Earth. (10
             Professional   ances.             94.Service and repair of electric iron,  hrs.)
             Knowledge 10   (NOS: PSS/N6003)      electric kettle, cooking range and
             Hrs.                                 geyser. (12 Hrs.)
                                               95.Service and repair of induction heater
                                                  and oven. (10 Hrs.)
                                               96.Service and repair of mixer and
                                                  grinder. (10 Hrs.)

                                               97.Service and repair of washing ma-
                                                  chine. (13Hrs.)

             Professional Execute testing,    98.Verify terminals, identify components Working principle, construction and
             Skill 75 Hrs.;  evaluate perfor-    and calculate transformation ratio of classification of transformer.
                            mance and main-      single-phase transformers. (8 Hrs.)
                            tenance of trans-                                      Single phase and three phase
             Professional former.             99.Perform OC and SC test to determine transformers.
             Knowledge 12                        and efficiency of single-phase trans-  Turn ratio and e.m.f. equation.
             Hrs.           (NOS:     PSS/       former. (12Hrs.)
                            N2406,    PSS/                                         Series and parallel operation of
                            N2407)            100 Determine voltage regulation of single-  transformer.
                                                 phase transformer at different loads
                                                 and power factors. (12 Hrs.)      Voltage Regulation and efficiency.
                                              101 Perform series and parallel operation  Auto Transformer and instrument
                                                 of two single phase transformers. (12 transformers (CT & PT). (12 Hrs.)
                                                 Hrs.)
                                              102 Verify the terminals and accessories
                                                 of three phase transformer HT and LT
                                                 side. (6Hrs.)
                                              103Perform 3 phase operation (i) delta-  Method of connecting three single
                                                 delta, (ii) delta-star, (iii) star-star,  phase transformers for three phase
                                                                                   operation.
                                              (iv) star-delta by use of three single phase
                                                 transformers. (6 Hrs.)            Types of Cooling, protective devices,
                                                                                   bushings and termination etc.
                                              104Perform testing of transformer oil. (6
                                                 Hrs.)                             Testing of transformer oil.

                                              105Practice on winding of small trans-  Materials used for winding and wind-
                                                 former. (8 Hrs.)                  ing wires in small transformer.
                                              106Practice of general maintenance of  (06 Hrs.)
                                                 transformer. (5 Hrs.)









                                                             (xvii)
   14   15   16   17   18   19   20   21   22   23   24