Page 19 - Electrician - 1st Year - TT - Punjabi
P. 19

Professional   Perform  testing,  90.Practice  for  range  extension  and  Errors and corrections in measure-
               Skill 25 Hrs.;  verify  errors  and  calibration of various measuring in-  ment.
                              calibrate  instru-   struments. (10 Hrs.)
                              ments.            91.Determine errors in resistance mea-  Loading effect of voltmeter and volt-
               Professional                        surement by voltage drop method. (8  age drop effect of ammeter in cir-
               Knowledge      (NOS: N/A)           hrs)                              cuits.
               05Hrs.                                                                Extension of range and calibration
                                                92.Test single phase energy meter for  of measuring instruments. (05 hrs.)
                                                   its errors. (7 Hrs.)


               Professional  Plan and carry out  93.Dismantle and assemble electrical  Working principles and circuits of
               Skill 75 Hrs.;  installation, fault de-  parts of various electrical appliances  common domestic equipment and
                             tection and repairing  e.g. cooking range, geyser, wash-  appliances.
                             of  domestic  appli-  ing machine and pump set. (25 Hrs.)  Concept of Neutral and Earth. (10
               Professional  ances.             94.Service and repair of electric iron,  hrs.)
               Knowledge 10  (NOS: PSS/N6003)      electric kettle, cooking range and
               Hrs.                                geyser. (12 Hrs.)
                                                95.Service and repair of induction heater
                                                   and oven. (10 Hrs.)

                                                96.Service  and  repair  of  mixer  and
                                                   grinder. (10 Hrs.)
                                                97.Service and repair of washing ma-
                                                   chine. (13Hrs.)

               Professional Execute  testing,   98.Verify terminals, identify components Working principle, construction and
               Skill 75 Hrs.;  evaluate  perfor-   and calculate transformation ratio of classification of transformer.
                             mance and main-       single-phase transformers. (8 Hrs.)
                             tenance of  trans-                                      Single  phase  and  three  phase
               Professional former.             99.Perform OC and SC test to determine transformers.
               Knowledge 12                        and efficiency of single-phase trans-  Turn ratio and e.m.f. equation.
               Hrs.          (NOS:      PSS/       former. (12Hrs.)
                             N2406,     PSS/                                         Series  and  parallel  operation  of
                             N2407)             100 Determine voltage regulation of single-  transformer.
                                                   phase transformer at different loads
                                                   and power factors. (12 Hrs.)      Voltage Regulation and efficiency.

                                                101 Perform series and parallel operation  Auto Transformer and instrument
                                                   of two single phase transformers. (12 transformers (CT & PT). (12 Hrs.)
                                                   Hrs.)
                                                102 Verify the terminals and accessories
                                                   of three phase transformer HT and LT
                                                   side. (6Hrs.)

                                                103Perform 3 phase operation (i) delta-  Method of connecting three single
                                                   delta, (ii) delta-star, (iii) star-star,  phase transformers for three phase
                                                                                     operation.
                                                (iv) star-delta by use of three single phase
                                                   transformers. (6 Hrs.)            Types of Cooling, protective devices,
                                                                                     bushings and termination etc.
                                                104Perform testing of transformer oil. (6
                                                   Hrs.)                             Testing of transformer oil.
                                                105Practice on winding of small  trans-  Materials used for winding and wind-
                                                   former. (8 Hrs.)                  ing wires in small transformer.
                                                106Practice of general maintenance of  (06 Hrs.)
                                                   transformer. (5 Hrs.)