Professional Install, test and main- 57.Use of various types of cells. (08 Hrs.) Chemical effect of electric current
               Skill 50 Hrs.;  tenance of batteries                                  and Laws of electrolysis.
                              and solar cell.    58.Practice on grouping of cells for speci-
               Professional                        fied voltage and current under differ- Explanation  of Anodes and  cath-
               Knowledge 10 (NOS: PSS/N6001)       ent conditions and care. (12 Hrs.)  odes.
               Hrs.
                                                 59.Prepare and practice on battery charg- Types of cells, advantages / disad-
                                                   ing and details of charging circuit. (12 vantages and their applications.
                                                   Hrs.)
                                                                                     Lead acid cell; Principle of opera-
                                                 60.Practice  on  routine, care/  mainte- tion and components.
                                                   nance  and testing  of batteries.  (08  Types of battery charging, Safety
                                                   Hrs.)
                                                                                     precautions,  test  equipment  and
                                                 61.Determine the number of solar cells maintenance.
                                                   in series / parallel for given power re-  Basic principles of Electro-plating
                                                   quirement. (10 Hrs.)
                                                                                     and cathodic protection
                                                                                     Grouping of cells for specified volt-
                                                                                     age and current.

                                                                                     Principle and operation of solar cell.
                                                                                     (10 Hrs.)
               Professional Estimate, Assemble, 62.Identify various conduits and different I.E. rules on electrical wiring.
               Skill 200 Hrs.; install and test wiring  electrical accessories. (8 Hrs.)  Types  of  domestic and  industrial
                             system.
                                                63.Practice cutting, threading of different wirings.
                             (NOS: PSS/N6001)      sizes & laying Installations. (17 Hrs.)
               Professional                                                          Study  of  wiring  accessories  e.g.
               Knowledge 42                     64.Prepare  test  boards  /  extension switches,  fuses,  relays,  MCB,
               Hrs.                                boards and mount accessories like ELCB, MCCB etc.
                                                   lamp holders, various switches, sock-  Grading of cables and current rat-
                                                   ets,  fuses,  relays,  MCB,  ELCB,  ings.
                                                   MCCB etc.  (25 Hrs.)
                                                                                     Principle of laying out of domestic
                                                                                     wiring.

                                                                                     Voltage drop concept.  (14 Hrs.)

                                                 65.Draw  layouts and  practice in  PVC  PVC  conduit and  Casing-capping
                                                   Casing-capping, Conduit wiring with  wiring system.
                                                   minimum to more number of points of  Different types of wiring -
                                                   minimum 15 mtr length. (15 Hrs.)
                                                                                     Power, control, Communication and
                                                 66.Wire up PVC conduit wiring to con-  entertainment wiring.
                                                   trol one lamp from two different places.
                                                   (15 Hrs.)                         Wiring circuits planning, permissible
                                                                                     load in sub-circuit and main circuit.
                                                 67.Wire up PVC conduit wiring to con-  (14 Hrs.)
                                                   trol  one lamp  from three  different
                                                   places. (15 Hrs.)

                                                 68.Wire up PVC conduit wiring and prac-
                                                   tice control of sockets and lamps in
                                                   different combinations using switch-
                                                   ing concepts. (15 Hrs.)
                                                69.Wire up the consumers main board Estimation of load, cable size, bill
                                                   with MCB & DB's switch and distribu- of material and cost.
                                                   tion fuse box. (15 Hrs.)
                                                                                     Inspection and testing of wiring in-
                                                70.Prepare and mount the energy meter stallations.
                                                   board. (15 Hrs.)
                                                                                     Special wiring circuit e.g. godown,
                                                71.Estimate the cost/bill of material for tunnel and workshop etc. (14 Hrs.)
                                                   wiring of  hostel/ residential building
                                                   and workshop. (15 Hrs.)