Page 23 - Electrician -1st year -TP - Malayalam
P. 23

Professional   Perform testing,  90. Practice for range extension and   Errors and corrections in measure-
              Skill 25 Hrs.;  verify errors and   calibration of various measuring   ment.
                            calibrate instru-    instruments. (10 Hrs.)
                            ments.             91. Determine errors in resistance mea-  Loading  effect  of  voltmeter  and
              Professional   (NOS: N/A)          surement by voltage drop method.   voltage drop effect of ammeter in
              Knowledge                          (8 hrs)                           circuits.
              05Hrs.                                                               Extension of range and calibration
                                               92. Test single phase energy meter for   of measuring instruments. (05 hrs.)
                                                 its errors. (7 Hrs.)
                                               93. Dismantle and assemble electrical
             Professional  Plan and carry out     parts  of  various  electrical  appli-  Working principles and circuits of
             Skill 75 Hrs.;  installation,  fault   ances e.g. cooking range, geyser,   common domestic equipment and
                            detection and re-     washing machine and pump set.     appliances.
                            pairing of domestic   (25 Hrs.)                         Concept of Neutral and Earth.
             Professional  appliances.                                              (10 hrs.)
             Knowledge      (NOS: PSS/N6003)   94. Service and repair of electric iron,
             10 Hrs.                              electric kettle, cooking range and
                                                  geyser. (12 Hrs.)
                                               95. Service and repair of induction
                                                  heater and oven. (10 Hrs.)
                                               96. Service  and  repair  of  mixer  and
                                                  grinder. (10 Hrs.)
                                               97. Service and repair of washing ma-
                                                  chine. (13Hrs.)

             Professional  Execute testing,   98. Verify terminals, identify components  Working  principle,  construction
             Skill 75 Hrs.;  evaluate perfor-    and calculate transformation ratio of  and classification of transformer.
                            mance and main-      single-phase transformers. (8 Hrs.)
                            tenance of trans-                                      Single phase and three phase
             Professional  former.            99. Perform OC and SC test to determine  transformers.
             Knowledge 12                        and efficiency of single-phase trans-  Turn ratio and e.m.f. equation.
             Hrs.           (NOS:  PSS/          former. (12Hrs.)
                            N2406, PSS/                                            Series  and  parallel  operation  of
                            N2407)            100 Determine voltage regulation of   transformer.
                                                 single-phase transformer at different
                                                 loads and power factors. (12 Hrs.)  Voltage Regulation and efficiency.
                                              101 Perform series and parallel opera-  Auto Transformer and instrument
                                                 tion of two single phase transformers.  transformers (CT & PT). (12 Hrs.)
                                                 (12 Hrs.)

                                              102 Verify the terminals and accessories
                                                 of three phase transformer HT and LT
                                                 side. (6Hrs.)
                                              103Perform 3 phase operation (i) delta-  Method of connecting three single
                                                 delta, (ii) delta-star, (iii) star-star,   phase transformers for three
                                                                                   phase operation.
                                              (iv) star-delta by use of three single
                                                 phase transformers. (6 Hrs.)      Types of Cooling, protective devic-
                                                                                   es, bushings and termination etc.
                                              104Perform testing of transformer oil.
                                                 (6 Hrs.)                          Testing of transformer oil.
                                              105Practice on winding of small trans-  Materials used for winding and
                                                 former. (8 Hrs.)                  winding wires in small transformer.
                                              106Practice of general maintenance of  (06 Hrs.)
                                                 transformer. (5 Hrs.)