Page 16 - Electrician 1st Year - TT - Hindi
P. 16

Professional Install, test and main- 57.Use of various types of cells. (08 Hrs.) Chemical effect of electric current
        Skill 50 Hrs.;  tenance of batteries                                 and Laws of electrolysis.
                      and solar cell.    58.Practice on grouping of cells for speci-
        Professional                        fied voltage and current under differ- Explanation of Anodes and cath-
        Knowledge 10 (NOS: PSS/N6001)       ent conditions and care. (12 Hrs.)  odes.
        Hrs.
                                         59.Prepare and practice on battery charg- Types of cells, advantages / disad-
                                            ing and details of charging circuit. (12 vantages and their applications.
                                            Hrs.)
                                                                             Lead acid cell; Principle of opera-
                                         60.Practice on routine, care/ mainte- tion and components.
                                            nance and testing of batteries. (08  Types of battery charging, Safety
                                            Hrs.)
                                                                             precautions, test equipment and
                                         61.Determine the number of solar cells maintenance.
                                            in series / parallel for given power re-  Basic principles of Electro-plating
                                            quirement. (10 Hrs.)
                                                                             and cathodic protection
                                                                             Grouping of cells for specified volt-
                                                                             age and current.
                                                                             Principle and operation of solar cell.
                                                                             (10 Hrs.)

        Professional Estimate, Assemble, 62.Identify various conduits and different  I.E. rules on electrical wiring.
        Skill 200 Hrs.; install and test wiring  electrical accessories. (8 Hrs.)  Types of domestic and industrial
                      system.
                                         63.Practice cutting, threading of different wirings.
                      (NOS: PSS/N6001)      sizes & laying Installations. (17 Hrs.)
        Professional                                                          Study of wiring accessories e.g.
        Knowledge 42                     64.Prepare test boards / extension switches, fuses, relays, MCB,
        Hrs.                                boards and mount accessories like ELCB, MCCB etc.
                                            lamp holders, various switches, sock-  Grading of cables and current rat-
                                            ets, fuses, relays, MCB, ELCB,    ings.
                                            MCCB etc.  (25 Hrs.)
                                                                              Principle of laying out of domestic
                                                                              wiring.
                                                                              Voltage drop concept.  (14 Hrs.)

                                         65.Draw layouts and practice in PVC  PVC conduit and Casing-capping
                                            Casing-capping, Conduit wiring with  wiring system.
                                            minimum to more number of points of  Different types of wiring -
                                            minimum 15 mtr length. (15 Hrs.)
                                                                              Power, control, Communication and
                                         66.Wire up PVC conduit wiring to con-  entertainment wiring.
                                            trol one lamp from two different places.
                                            (15 Hrs.)                         Wiring circuits planning, permissible
                                                                              load in sub-circuit and main circuit.
                                         67.Wire up PVC conduit wiring to con-  (14 Hrs.)
                                            trol one lamp from three different
                                            places. (15 Hrs.)
                                         68.Wire up PVC conduit wiring and prac-
                                            tice control of sockets and lamps in
                                            different combinations using switch-
                                            ing concepts. (15 Hrs.)
                                         69.Wire up the consumers main board Estimation of load, cable size, bill
                                            with MCB & DB's switch and distribu- of material and cost.
                                            tion fuse box. (15 Hrs.)
                                                                              Inspection and testing of wiring in-
                                         70.Prepare and mount the energy meter stallations.
                                            board. (15 Hrs.)
                                                                              Special wiring circuit e.g. godown,
                                         71.Estimate the cost/bill of material for tunnel and workshop etc. (14 Hrs.)
                                            wiring of hostel/ residential building
                                            and workshop. (15 Hrs.)


                                                        (xiv)
   11   12   13   14   15   16   17   18   19   20   21