Page 12 - Electrician 1st Year - TT - Hindi
P. 12

अ ास
                                                                                                      पृ  सं.ृ  सं.
                                                     अ ास के  शीष क  के  शीष क
           अ ास सं.  सं.
            अ ास                                     अ ास                                    अ ास     प

                                                                                             प रणाम
                                                                                             प रणाम
         1.12.99 & 100   ट ांसफाम र म   ास - OC और SC परी ण - द ता - वो ेज िविनयमन (Transformer
                        losses - OC and SC test - efficiency - Voltage Regulation)                     301
        1.12.101        दो एकल फ़े ज ट ा फाम रों का समा र  चालन (Parallel operation of two
                        single phase transformers)                                                     306
         1.12.102 & 103  तीन फे ज़ ट ांसफाम र - स  न (Three Phase transformer - Connections)            309

         1.12.104       ट ांसफाम र का शीतलन - ट ांसफाम र ऑयल और परी ण ( Cooling of transformer -
                        Transformer oil and testing) (QR Code)*                                       314
         1.12.105       एक छोटे ट ांसफाम र की वाइ  ंग (Winding a small transformer) (QR Code)*        318

        1.12.106        तीन फे ज ट ांसफाम र का सामा  रखरखाव (General maintenance of
                        three-phase transformers)                                                      322


                        प रयोजना काय  (Project work)  (QR Code)*                                      324



                                       ºÉƪÉÉäÊVÉiÉ / +¦ªÉÉºÉ {ÉÊ®úhÉɨÉ



               इस पु क के  अ  म  आप यह जान सक  गे


           .सं.                                  अ यन के  प रणाम                             अ ास सं.


           1      Prepare profile with an appropriate accuracy as per drawing following
                  safety precauti  ons.  (NOS: PSS/N2001)                                 1.1.01 - 1.1.16

           2      Prepare electrical wire joints, carry out soldering, crimping and measure
                  insulation resistance of underground cable. (NOS: PSS/N0108)             1.2.17 - 1.2.26

           3      Verify characteristics of electrical and magnetic circuits.
                  (NOS: PSS/N6001, PSS/N6003)                                             1.3.27 - 1.5.56

           4      Install, test and maintenance of batteries and solar cell.(NOS: PSS/N6001)   1.6.57 - 1.6.61

           5      Estimate, Assemble, install and test wiring system. (NOS: PSS/N6001)        1.7.62 - 1.8.74

           6      Plan and prepare Earthing installation. (NOS: PSS/N6002)                 1.8.75 - 1.8.77

           7      Plan and execute electrical illumination system and test. (NOS: N/A)      1.9.78 - 1.9.82

           8      Select and perform measurements using analog / digital instruments
                  and install/ diagnose smart meters. (NOS: PSS/N1707)                     1.10.83 - 1.10.89

           9      Perform testing, verify errors and calibrate instruments. (NOS: N/A)      1.10.90 - 1.10.92

           10     Plan and carry out installation, fault detection and repairing of domestic
                  appliances. (NOS: PSS/N6003)                                            1.11.93 - 1.11.97

           11     Execute testing, evaluate performance and maintenance of transformer.
                  (NOS: PSS/N2406, PSS/N2407)                                             1.12.98 - 1.12.106


                                                         (x)
   7   8   9   10   11   12   13   14   15   16   17