72.Practice wiring of hostel and residen-
                                                  tial building as per IE rules. (15 Hrs.)
                                               73.Practice wiring of institute and work-
                                                  shop as per IE rules. (15 Hrs.)

                                               74.Practice testing / fault detection of
                                                  domestic and industrial wiring instal-
                                                  lation and repair. (15Hrs.)
              Professional  Plan and prepare   75.Prepare pipe earthing and measure  Importance of Earthing.
              Skill 25 Hrs.;  Earthing installa-  earth resistance by earth tester /  Plate earthing and pipe earthing
                            tion.                 megger. (10 Hrs.)                methods and IEE regulations.
                            (NOS: PSS/N6002)   76.Prepare plate earthing and measure  Earth resistance and earth leakage
              Professional
              Knowledge                           earth resistance by earth tester /  circuit breaker. (5 Hrs.)
              07 Hrs.                             megger. (10 Hrs.)
                                               77.Test earth leakage by ELCB and re-
                                                  lay. (5 Hrs.)
              Professional  Plan and execute   78.Install light fitting with reflectors for di- Laws of Illuminations.
              Skill 45Hrs.;  electrical illumina-  rect and indirect lighting. (10 Hrs.)  Types of illumination system.
                            tion system and    79.Group different wattage of lamps in
                            test.                                                   Illumination factors, intensity of
              Professional  (NOS: N/A)            series for specified voltage. (5 Hrs.)  light.
              Knowledge                        80.Practice installation of various lamps  Type of lamps, advantages/ disad-
              10Hrs.                              e.g. fluorescent tube, HP mercury  vantages and their applications.
                                                  vapour, LP mercury vapour, HP sodium
                                                  vapour, LP sodium vapour, metal ha- Calculations of lumens and effi-
                                                  lide etc. (18 Hrs.)               ciency. (10 hrs.)
                                               81.Prepare decorative lamp circuit to pro-
                                                  duce rotating light effect/running light
                                                  effect. (6 Hrs.)
                                               82.Install light fitting for show case light-
                                                  ing. (6 Hrs.)

              Professional  Select and perform  83.Practice on various analog and digi-  Classification of electrical instru-
              Skill 50 Hrs.;  measurements us-    tal measuring Instruments. (5 Hrs.)  ments and essential forces required
                            ing analog / digital  84.Practice on measuring instruments  in indicating instruments.
                            instruments and in-   in single and three phase circuits e.g.  PMMC and Moving iron instru-
              Professional  stall/ diagnose       multi-meter, Wattmeter, Energy    ments.
              Knowledge 08  smart meters.         meter, Phase sequence meter and
              Hrs.                                Frequency meter etc. (12Hrs.)     Measurement of various electrical
                            (NOS: PSS/N1707)                                        parameters using different analog
                                               85.Measure power in three phase cir-  and digital instruments.
                                                  cuit using two wattmeter methods.
                                                  (8 Hrs.)                          Measurement of energy in three
                                                                                    phase circuit.
                                               86.Measure power factor in three phase
                                                  circuit by using power factor meter  Automatic meter reading infrastruc-
                                                  and verify the same with voltmeter,  tures and Smart meter.
                                                  ammeter and wattmeter readings.   Concept of Prosumer and distrib-
                                                  (10Hrs.)                          uted generation.

                                               87.Measure electrical parameters using  Electrical supply requirements of
                                                  tong tester in three phase circuits.  smart meter, Detecting/clearing the
                                                  (08Hrs.)                          tamper notifications of meter.  (08

                                               88.Demonstrate Smart Meter, its physi-  hrs.)
                                                  cal components and Communication
                                                  components. (03 Hrs.)
                                               89.Perform meter readings, install and
                                                  diagnose smart meters. (04 Hrs.)