Page 23 - Electrician 1st year - TP
P. 23
72.Practice wiring of hostel and residen-
tial building as per IE rules. (15 Hrs.)
73.Practice wiring of institute and work-
shop as per IE rules. (15 Hrs.)
74.Practice testing / fault detection of
domestic and industrial wiring instal-
lation and repair. (15Hrs.)
Professional Plan and prepare 75.Prepare pipe earthing and measure Importance of Earthing.
Skill 25 Hrs.; Earthing installa- earth resistance by earth tester / Plate earthing and pipe earthing
tion. megger. (10 Hrs.) methods and IEE regulations.
(NOS: PSS/N6002) 76.Prepare plate earthing and measure Earth resistance and earth leakage
Professional
Knowledge earth resistance by earth tester / circuit breaker. (5 Hrs.)
07 Hrs. megger. (10 Hrs.)
77.Test earth leakage by ELCB and re-
lay. (5 Hrs.)
Professional Plan and execute 78.Install light fitting with reflectors for di- Laws of Illuminations.
Skill 45Hrs.; electrical illumina- rect and indirect lighting. (10 Hrs.) Types of illumination system.
tion system and 79.Group different wattage of lamps in
test. Illumination factors, intensity of
Professional (NOS: N/A) series for specified voltage. (5 Hrs.) light.
Knowledge 80.Practice installation of various lamps Type of lamps, advantages/ disad-
10Hrs. e.g. fluorescent tube, HP mercury vantages and their applications.
vapour, LP mercury vapour, HP sodium
vapour, LP sodium vapour, metal ha- Calculations of lumens and effi-
lide etc. (18 Hrs.) ciency. (10 hrs.)
81.Prepare decorative lamp circuit to pro-
duce rotating light effect/running light
effect. (6 Hrs.)
82.Install light fitting for show case light-
ing. (6 Hrs.)
Professional Select and perform 83.Practice on various analog and digi- Classification of electrical instru-
Skill 50 Hrs.; measurements us- tal measuring Instruments. (5 Hrs.) ments and essential forces required
ing analog / digital 84.Practice on measuring instruments in indicating instruments.
instruments and in- in single and three phase circuits e.g. PMMC and Moving iron instru-
Professional stall/ diagnose multi-meter, Wattmeter, Energy ments.
Knowledge 08 smart meters. meter, Phase sequence meter and
Hrs. Frequency meter etc. (12Hrs.) Measurement of various electrical
(NOS: PSS/N1707) parameters using different analog
85.Measure power in three phase cir- and digital instruments.
cuit using two wattmeter methods.
(8 Hrs.) Measurement of energy in three
phase circuit.
86.Measure power factor in three phase
circuit by using power factor meter Automatic meter reading infrastruc-
and verify the same with voltmeter, tures and Smart meter.
ammeter and wattmeter readings. Concept of Prosumer and distrib-
(10Hrs.) uted generation.
87.Measure electrical parameters using Electrical supply requirements of
tong tester in three phase circuits. smart meter, Detecting/clearing the
(08Hrs.) tamper notifications of meter. (08
88.Demonstrate Smart Meter, its physi- hrs.)
cal components and Communication
components. (03 Hrs.)
89.Perform meter readings, install and
diagnose smart meters. (04 Hrs.)
(xxi)