Page 19 - Electrician 1st year - TT - Malayalam
P. 19

Professional   Perform testing,  88. Demonstrate Smart Meter, its physi-  Electrical supply requirements of
              Skill 25 Hrs.;  verify errors and   cal components and Communica-    smart  meter,  Detecting/clearing
                            calibrate instru-    tion components. (03 Hrs.)        the tamper notifications of meter.
                            ments.             89. Perform meter readings, install and   (08 hrs.)
              Professional   (NOS: N/A)          diagnose smart meters. (04 Hrs.)
              Knowledge                                                            Errors and corrections in measure-
              05Hrs.                           90. Practice  for  range  extension  and   ment.
                                                 calibration of various measuring   Loading  effect  of  voltmeter  and
                                                 instruments. (10 Hrs.)

             Professional  Plan and carry out   91. Determine errors in resistance   voltage  drop  effect  of  ammeter
             Skill 75 Hrs.;  installation,  fault   measurement by voltage drop     in circuits.
                            detection and re-     method. (8 hrs)                   Extension of range and calibra-
                            pairing of domestic  92. Test single phase energy meter for   tion of measuring instruments.
             Professional  appliances.            its errors. (7 Hrs.)              (05 hrs.)
             Knowledge      (NOS: PSS/N6003)
             10 Hrs.                           93. Dismantle and assemble electrical
                                                  parts  of  various  electrical  appli-
                                                  ances e.g. cooking range, geyser,
                                                  washing machine and pump set.
                                                  (25 Hrs.)
                                               94. Service and repair of electric iron,
                                                  electric kettle, cooking range and
                                                  geyser. (12 Hrs.)
             Professional  Execute  testing,   95. Service and repair of induction heater  Working principles and circuits of
             Skill 75 Hrs.;  evaluate perfor-    and oven. (10 Hrs.)               common domestic equipment and
                            mance and main-   96. Service  and  repair  of  mixer  and   appliances.
                            tenance of trans-                                      Concept of Neutral and Earth. (10
             Professional  former.               grinder. (10 Hrs.)                hrs.)
             Knowledge 12                     97. Service and repair of washing ma-
             Hrs.           (NOS: PSS/           chine. (13Hrs.)                   Working  principle,  construction
                            N2406, PSS/                                            and classification of transformer.
                            N2407)            98. Verify terminals, identify components
                                                 and calculate transformation ratio of  Single phase and three phase
                                                 single-phase transformers. (8 Hrs.)  transformers.
                                              99. Perform OC and SC test to determine  Turn ratio and e.m.f. equation.
                                                 and efficiency of single-phase trans-
                                                 former. (12Hrs.)
                                              100 Determine voltage regulation of
                                                 single-phase transformer at different
                                                 loads and power factors. (12 Hrs.)
                                              101 Perform series and parallel opera-  Series and parallel operation of
                                                 tion of two single phase transformers.  transformer.
                                                 (12 Hrs.)                          Voltage Regulation and efficiency.
                                              102 Verify the terminals and accessories    Auto Transformer and instrument
                                                 of three phase transformer HT and LT   transformers (CT & PT). (12 Hrs.)
                                                 side. (6Hrs.)
                                                                                    Method of connecting three single
                                              103Perform 3 phase operation (i) delta-  phase transformers for three
                                                 delta, (ii) delta-star, (iii) star-star,   phase operation.
                                              (iv)  star-delta  by  use  of  three  single   Types of Cooling, protective devic-
                                                 phase transformers. (6 Hrs.)       es, bushings and termination etc.

                                              104Perform testing of transformer oil.   Testing of transformer oil.
                                                 (6 Hrs.)
                                                                                    Materials used for winding and
                                              105Practice on winding of small trans-  winding wires in small transformer.
                                                 former. (8 Hrs.)
                                                                                    (06 Hrs.)
                                              106Practice of general maintenance of
                                                 transformer. (5 Hrs.)
                                                             (xvii)
   14   15   16   17   18   19   20   21   22   23   24