Page 19 - D'Man Civil 1st Year TP - Kannada
P. 19

74. Practice    leveling  with  different   •   Contouring  ;-Definition,
                                                instruments. (04 hrs.)                Characteristics, Methods.

                                             75. Check levelling. (04 hrs.)        •   Direct and Indirect methods
                                             76. Profile  levelling  or  Longitudinal,   •    Interpolation of Contour,
                                                plotting the profile.   (03 hrs.)     Contour  gradient , Uses of
                                                                                      Contour plan and Map.
                                             77. Surveying of a building site with chain
                                                and Levelling Instrument with a view   •   Knowledge on road project. (12
                                                to computing earth work. (04 hrs.)    hrs.)

                                             78. Contour -  Direct and Indirect methods.
                                                (03 hrs.)
                                             79. Make Topography map, contours map.
                                                (04 hrs.)
                                             80. Solve  trigonometric  problems.  (03
                                                hrs.)
                                             81. Prepare a road project in a certain
                                                alignment. (04 hrs.)

                            Perform a site    Theodolite survey:-                  Theodolite survey:-
                            survey with
                            Theodolite and    82. Field work of theodolite. (05 hrs.)  •   Introduction.
                            prepare site      83. Horizontal angle. (05 hrs.)      •   Types of   theodolite.
                            plan.
                                              84. Vertical angle. (05 hrs.)        •   Uses, Methods of Plotting.
                                              85. Magnetic bearing of a line. (05 hrs.)  •   Transit vernier theodolite.
                                              86. Levelling with a theodolite. (05 hrs.)  •   Terms of transit theodolite.

                                              87. Calculation of area from traverse. (04  •   Fundamental line of theodolite.
                                                 hrs.)
                                                                                   •   Adjustment of theodolite.
                                              88. Determination of Heights. (06 hrs.)
                                                                                   •   Checks, Adjustment of errors.
                                              89. Calculation of departure, latitude,   •   Open and closed traverse and
                                                 northing and easting- ( 5hrs)
                                                                                      their application to Engineering
                                              90. Setting  out  work-Building,culvert,   Problems.
                                                 centre  line  of  Dams,Bridges  and
                                                 Slope of Earth work, etc. (16hrs)  •   Vernier scale- types.
                                                                                   •   Measurement  of  horizontal
                                                                                      angle.

                                                                                   •   Measurement of vertical angle.
                                                                                   •   Adjustment of a close traverse.
                                                                                   •   Problems in transit theodolite-
                                                                                      departure, latitude, northing and
                                                                                      easting. (12 hrs.)